
Battery Due Diligence Slipped to 2027. The QR Code Did Not
Reading one deadline and getting two wrong
A supplier emails to say that battery due diligence has been pushed back two years, so there is nothing to do before August 2027. If you import cordless tools, e-bikes, inverters or battery-embedded goods into the EU, filing that email is an expensive mistake: the delay covers one obligation in Regulation (EU) 2023/1542, and the one that lands on 18 February 2027 has not moved at all.
Three clocks in one table
This is not a single-date instrument: it stacks obligations that start on three kinds of clock — firm dates, one date stopped by an amending regulation, and dates that float for want of an adopted act. The right-hand column is the only one that matters.
| Obligation | Reference | Printed date | Clock status |
|---|---|---|---|
| EPR registration + authorised representative | Arts. 55–57 | 18 Aug 2025 | Already live |
| QR code on every battery | Art. 13(6) | 18 Feb 2027 | Firm |
| Battery passport (LMT, EV, industrial > 2 kWh) | Art. 77 | 18 Feb 2027 | Firm, no size threshold |
| Supply chain due diligence | Arts. 48–52 | 18 Aug 2027 | Stopped (Reg. 2025/1561) |
| Carbon footprint declaration | Art. 7 | 18 Feb 2025 (EV), 18 Feb 2026 (industrial) | Floating: delegated act not adopted |
| Information and capacity label | Art. 13(1)–(3) | 18 Aug 2026 | Floating: “or 18 months after the implementing act” |
The two clocks that are not running
Regulation (EU) 2025/1561, adopted 18 July 2025 and published 30 July 2025 under the Omnibus IV simplification package, did exactly two things: it moved the application date in Article 48(1) from 18 August 2025 to 18 August 2027, and pushed the Article 48(5) deadline for the Commission’s guidelines on applying Articles 49 and 50 to 26 July 2026.
Everything substantive survived intact, and so did the sequencing problem: 18 August 2027 is the date by which the system must already be verified, and notified-body verification is not something you arrange in a quarter. Two caveats. Trackers published in autumn 2026 reported finding no such guidelines, on the Commission’s battery pages or in the Official Journal, after the July deadline passed. And commentary has floated raising the size threshold to EUR 150 million; we found no confirmation of adoption, so Article 47 remains operative.
The second stalled clock is the carbon footprint. Article 7 requires a declaration per model and per manufacturing plant, with base dates staggered by category — sources converge on 18 February 2025 for electric vehicle batteries, 18 February 2026 for rechargeable industrial batteries other than those with exclusively external storage, 18 August 2028 for light means of transport, and 18 August 2030 for external-storage industrial.
Those are not commencement dates. Each applies on the later of the base date or twelve months after the methodology act enters into force — and as of mid-November 2026 no such act has been published, a 2024 draft having gone out for feedback and never been adopted. The Commission’s own Article 7 deadline of 18 August 2026 for the EV performance-class act has come and gone. Vendor guides printing the base dates flatly are how importers believe an obligation is live when it is not.
February 2027: a QR code pointing at a report nobody owes yet
From 18 February 2027, Article 13(6) requires a QR code on every battery placed on the EU market, whatever its category. For LMT, EV and industrial batteries above 2 kWh it resolves to the Article 77 battery passport, covered separately in our guide to the digital product passport. For everything else it gives access to the label information, the declaration of conformity, waste management information, and where applicable the Article 52(3) due diligence report.
Put the two dates side by side. The code must give access to the report from 18 February 2027; the duty to produce that report starts 18 August 2027. Six months apart. “Where applicable” probably absorbs the gap in practice but does not close it: if you are above the Article 47 threshold, or already covered by a group-level report, the question arrives in February rather than August.
The sharper consequence is that the EUR 40 million threshold protects no one from February. Article 47 exempts smaller operators from the diligence work; the passport and QR code carry no turnover threshold at all. The small importer is excused the hard part and still owns the label pointing to it.
United States, United Kingdom, India: three different kinds of gap
For a US brand the gap is categorical. We found no federal requirement for a battery passport or for upstream mineral due diligence. What exists is a state extended producer responsibility patchwork — around nine states plus the District of Columbia have enacted battery EPR, with Oregon joining through a 2026 bill. Vermont extended its 2014 law so that from 1 January 2026 obligated producers must join an approved stewardship plan or stop selling in the state; California runs a stewardship programme alongside a separate lithium battery registration with CalRecycle, plus a consumer recycling fee that began the same day. All of it is about collection and recycling. None of it produces the upstream evidence the EU will ask for.
For a UK business the gap is geographic. Great Britain still operates the retained 2008 and 2009 regulations derived from the old EU directive, while Northern Ireland was given domestic effect of the EU battery regulation by a statutory instrument published in September 2026 under the Windsor Framework — the parliamentary debate was explicit that it introduced no new policy beyond the EU text. Vendors expect a broader DEFRA review, but we found no published consultation. The result is one firm running two digital compliance regimes inside its own home market.
For an Indian exporter the gap is directional. Domestic battery waste rules already require central registration and EPR certificates, checked by customs at clearance — but none of it generates a cobalt or natural graphite risk assessment. From 2027 the EU buyer will ask for one, contractually, long before any Indian rule does.
Three calculations, and what is left to do
One — the last useful purchase order. An importer turning over USD 14 million brings in 2,400 LMT battery packs from Shenzhen, around 31,000 lb of cells a year. Article 47 exempts it from due diligence; the passport binds it anyway on 18 February 2027. With a typical cycle of 20 days production, 40 days ocean transit and roughly 10 days to clear and shelve, the last order that can arrive carrying compliant data has to be placed around mid-December 2026. The real deadline is December, not February.
Two — a 5 kWh storage system. Above 2 kWh, so inside the passport scope and bound to February 2027. The Article 7 base date for rechargeable industrial batteries, 18 February 2026, has passed, but the clock never started. If the methodology act entered into force in Q2 2027, the declaration would fall due in Q2 2028 — while the passport already carries a carbon footprint field in February 2027. The importer must populate a field whose official calculation rule is missing, which argues for demanding plant-level figures now, as importers already do for embedded emissions under CBAM.
Three — the threshold, read properly. Article 47 looks at net turnover in the financial year preceding the last financial year. A company growing from EUR 38 million to EUR 41 million during 2026 is not caught in 2027 — the 2025 year is the one examined — while a one-off EUR 42 million spike in 2025 catches it in 2027 even though 2026 fell back to EUR 35 million. Confirm that two-year lag on the consolidated text before relying on it, but it explains how a growing firm and a shrinking firm misjudge their position in opposite directions.
Four steps remain before February. Classify every battery in the catalogue — portable, LMT, EV, industrial with or without external storage — because category alone decides whether the passport applies. Confirm that EPR registration and, where needed, an authorised representative exist in each destination Member State, and that your contract distinguishes that mandate from the Article 4 responsible economic operator under Regulation (EU) 2019/1020; the same two-mandate trap appears under the GPSR responsible person rules. Work backwards from 18 February 2027 to fix your last useful order date. Then start upstream collection on the four minerals and on plant-level emissions — not to declare, but to learn now whether your supplier can produce the data at all.
We are not publishing a cost range: the quotes we see vary too widely for an average to be honest. The effect on unit cost is modelable, though. The TRADE-COST calculator sits these compliance lines next to duty and freight, as we did for packaging eco-contributions — the only place a regulatory obligation becomes a comparable number.
Frequently asked questions
Does the delay to 18 August 2027 mean I can stop work on due diligence?+
No. Regulation (EU) 2025/1561 changed dates, not substance: the obligations in Articles 49 to 52 — a board-level due diligence policy, supply chain mapping, and risk management on cobalt, lithium, nickel and natural graphite — are unchanged. And 18 August 2027 is the date by which your system must already have been verified by a notified body, not the date you start building it. Third-party verification typically takes several quarters to prepare. Available readings put the first public report in mid-2028 and every three years after, which is worth confirming against the consolidated text.
My turnover is under EUR 40 million. Am I fully exempt?+
Only from due diligence. Article 47 exempts operators whose net turnover stayed below EUR 40 million, provided they are not part of a group that exceeds the figure on a consolidated basis. The exemption does not touch labelling, the 18 February 2027 QR code, the battery passport or extended producer responsibility registration — none of which has a size threshold. A company doing USD 11 million a year is still fully exposed to the February deadline.
Why can I not declare my batteries’ carbon footprint now?+
Because the calculation method does not yet exist in law. Article 7 sets base dates per category, but each applies on the later of two events: the base date itself, or twelve months after the delegated or implementing act defining the methodology enters into force. As of mid-November 2026 no methodology act has been published, and the Commission’s own Article 7 deadline of 18 August 2026 for the electric vehicle act has passed. You can collect upstream data; you cannot produce a compliant declaration.
I sell in Great Britain and Northern Ireland. Is that one regime or two?+
Two, on the same island. Great Britain still runs the retained 2008 and 2009 battery regulations, which transposed the old EU Battery Directive. Northern Ireland applies the EU regulation through a 2026 statutory instrument published that September, under the Windsor Framework. Compliance vendors expect a wider DEFRA review of UK battery producer responsibility, but we found no published consultation text, so treat the GB reform timetable as expectation rather than fact and check gov.uk directly.
Does any US federal rule require a battery passport or supply chain due diligence?+
We found no federal US equivalent to either. What exists instead is a state-level extended producer responsibility patchwork — roughly nine states plus the District of Columbia have enacted battery EPR — which addresses collection and recycling, not upstream mineral due diligence. The practical consequence for a US brand exporting to the EU is that nothing in its domestic compliance file generates the evidence the EU regulation will ask for from 2027.
Marie Fontaine
Marie leads customs research at TRADE-COST. She spent eight years in tariff classification and post-clearance audits before joining the product team to turn customs expertise into software.
Calculate your landed cost in 30 seconds
Duties, VAT, freight, insurance and margin — one form, one complete result.
Try the calculator →The TRADE-COST newsletter
Once a month: our analyses on customs, freight, and changes in international trade rules. No spam, one-click unsubscribe.
By subscribing, you agree to receive our emails. One-click unsubscribe from every email.
Related articles
Digital Product Passport: the one deadline that is already fixed
The digital product passport is treated as a 2030 problem. It is not: the battery passport binds on 18 February 2027 (Reg. (EU) 2023/1542, art. 77). Exact scope, who carries the duty on import, the ESPR 2025-2030 plan, plus the UK, US and India positions.
GPSR: no EU responsible person, no EU sale
Regulation (EU) 2023/988 has applied since 13 December 2024: technical documentation kept 10 years, an email address required on the product, 2 working days for a marketplace to act on an authority order. What US, UK and Indian sellers must put in place, with numbers.
Goods Detained for Suspected Counterfeiting: The Clock, the Options and the Real Cost
A counterfeit detention notice starts a short clock, and in several systems silence can count as consent to destruction. How detention works under US CBP rules, the UK and EU regime and India's enforcement rules, what each response costs, and why parallel imports are handled differently.